Industry · Gas Distribution

The same platform, shaped to gas distribution

From emergency calls to gas activation, your field work is set up without code, by defining work order types, forms and workflows.

See the process mapping Book a meeting
SevkAI Flow workflow designer: steps, conditions and approvals defined by drag and drop

Why it fits

Distribution work follows the same logic: report, dispatch, field, record

In SevkAI, work order types, field forms, approval steps and deadline rules are defined through configuration. The core built for electricity is used as is for gas; what changes are your process definitions.

Work order types

Gas leak, internal installation inspection, gas activation and more, with their own fields

Field forms

Checklists, measurement fields, mandatory photos and signatures

Workflows and approvals

Steps, conditions and approval chains with SevkAI Flow

Deadline and regulation rules

Response times and alerts as a rule pack

Process mapping

Where your gas processes live in SevkAI

Gas process SevkAI equivalent How it is set up
187 emergency calls, gas leaksFault and Repair workspace, smart dispatch to the nearest crew, SOS and live trackingConfiguration
Meter installation, exchange, disconnection, sealsMetering workspace, meter and seal custody, bulk debt checkConfiguration
Internal installation inspection, gas activationNew work order type, inspection form, mandatory photo and signatureConfiguration
Periodic inspection, pressure regulating station maintenance, cathodic protection readingsPlanned maintenance calendar, interval rules, measurement formsConfiguration
Pipeline, valve and service box inventoryAsset management (EAM): configurable class and attribute catalogue, GIS matching, work orders from the mapConfiguration
Excavation permits, third-party damageMulti-channel request records, permit lifecycle and four-eyes approvalConfiguration
EPDK gas regulation deadlinesRegulation rule pack, deadline breach alerts and reportsConfiguration
Valve closure impact analysis, pressure modelTopology tracing and digital twin infrastructure adapted to gas network physicsAdaptation

Configuration: defined in the user interface. Adaptation: an industry-specific calculation model is added on top of the platform.

The core you get as is

Field safety and evidence from day one

  • Safety gate: no job starts until the checklist is confirmed
  • Offline mobile: records outside coverage, syncs later
  • Evidence: geotagged, time-stamped photos and signatures
  • Integration: with SAP, GIS and customer systems
SevkAI Field mobile app: crew session and safety, job list and field screens

How the rollout works

  1. 01

    Process workshop

    We map your job types, forms and deadlines together

  2. 02

    Configuration

    Types, workflows and rules are defined in the interface

  3. 03

    Pilot region

    Run in one selected region with real crews

  4. 04

    Rollout

    Integrations connected, opened to all regions

Let’s model your processes together

Start with a process workshop; we will show your gas workflows running live on SevkAI.

Request a Workshop